Two standards, one visit, and on new stock one document settles most of it.
Timber pest inspection is carried out under AS 4349.3 and reports evidence and conducive conditions. No treatment is carried out, and no property is ever certified free of timber pests. AS 3660 is the standard the management system itself is installed under.
0 checkpoints across 0 areas on a standard Catherine Field building and pest inspection. We need the property accessible and, on a new build, the supervisor aware an independent inspector is attending. Whatever is blocked on the day is recorded as inaccessible, never as checked.
From Austral lock-up, fixing and handover work, roughly eight kilometres north.










New Construction Stage Inspections Seven checks through a Catherine Field build, hardware included.
Pre-Handover (PCI) Inspections Room by room, while your bargaining position holds.
Defect Investigation Reports One element, taken on its own and measured against its requirement.
Pre-Purchase Building Inspections A visual inspection under AS 4349.1, on mixed stock. Instant online pricing, or talk to the booking team on 1300 471 805.
A permanent notice, usually inside the meter box, naming the termite system installed, who installed it, and what maintenance it requires. AS 3660 requires it and nothing else records it.
Because a downpipe that is not connected puts a large volume of water beside the building every time it rains, and persistent moisture at the wall is the single most common conducive condition there is.
No inspector honestly can. Their work happens inside timber, out of sight, so what the report can honestly give you is the evidence visible on the day and the conditions encouraging them.