Catherine Field Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Fixing stage inspection in Catherine Field

Joinery in, painter not yet started, and the last inexpensive look at the carpentry.

  • After mouldings, doors and joinery, before the painter
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Catherine Field inspectionSend the address and where the build has got to.

Fully licensed & accredited

Stage5 of 7
When to bookAfter mouldings, doors and joinery, before the painter
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the Guide to Standards and Tolerances 2017 and your contract selections

What is included in a Catherine Field fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Catherine Field builds

The Austral fixing stage record is a list of things not yet done: a ground floor downpipe not installed, service penetrations still to be sealed and grading still required, all noted alongside an inspection summary of medium to good condition. That combination is normal at this stage and it is precisely why the visit is worth making before the painter arrives and covers the evidence. The photographs below were taken in Leppington, Oran Park or Austral, between two and eight kilometres from Catherine Field, and each caption names its suburb. We would rather tell you that than let another job pass as a local one.

What we find at this stage in Catherine Field

  • Downpipes installed and connected on every level
  • Service penetrations sealed through external walls
  • Door and window infills completed
  • External doors hung and operating
  • Site grading done before the landscaping
The fixing stage summary, Austral, Catherine Field
The fixing stage summary, Austral
External door not installed, Austral, Catherine Field
External door not installed, Austral
Sample findings

Sample defects found during our fixing inspections in Catherine Field

Annotated findings from Fixing inspections on Catherine Field builds. Client addresses withheld.

Downpipe not installed to ground floor, recorded at a fixing stage inspection in Austral
Ground floor downpipe not installed, Austral
Service penetrations to be sealed and caulked, recorded at a fixing stage inspection in Austral
Service penetration to be sealed, Austral
Grading is required, recorded at a fixing stage inspection in Austral
Grading still required, Austral
Door and window infills required, recorded at a lock-up inspection in Austral
Door and window infills required, Austral

The other stages of a Catherine Field build

  1. Bored piers inspection in Catherine Field1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Catherine Field2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Catherine Field3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Catherine Field4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Waterproofing inspection in Catherine Field6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Catherine Field7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Catherine Field →

Guides

Construction stage guides for Catherine Field

All guides →

Book a fixing inspection in Catherine Field

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Catherine Field: common questions

Why go before the painter?

Paint fills gaps and hides damage. Once it is on, arguing that a mark or a gap existed beforehand comes down to your word against the builder's.

What is a window infill?

Whatever closes the space between a window frame and the opening it sits in. Left incomplete, it is an air and water path running the whole perimeter of the window.

Why does grading appear at fixing stage?

Because it should be done before the landscaper arrives. Once turf and garden beds are in, correcting the fall around a house is earthworks rather than a morning's work.

Is a summary of medium to good a pass?

It is a description, not a grade. It tells you the job is in reasonable shape, which does not make the individual items on the list go away.

How long does the visit run?

Two to three hours on most houses through this corridor.

What should I provide?

Your contract and the selections schedule, so what has gone in can be read against what you signed for.

CallGet a Free Quote